Paper stone putty

Features:Excellent adhesion and excellent adhesion. The batch scraping is random, the flatness is good, the drying process does not shrink, and the micro crack can be effectively prevented. Excellent water resistance, no water falling off. This product is versatile and is an excellent wall putty for all kinds of building bases. At the same time, it saves construction costs and is safe and reliable.

Scope of application:The underlying putty of the paint on the base of the new and old walls.
The original veneer (paint, tile, mosaic, stone and other smooth walls) is directly refurbished as a paint primer.
It is more suitable for base layer putty for imitation aluminum plate, metal paint and other coatings.

  1. Construction Process
  2. Technical Indicators
  3. Technical Indicators

-Paper stone putty ratio: putty powder 25kg/bag, add 4.5kg/barrel of paint liquid, then add 4-5.5kg water, stir well. The formulated putty can be used for 2 hours at 25 ° C, and the overtime will be scrapped due to curing.
-Remove the original base layer from the soft and shelled parts and clean the tile or mosaic surface.
-Pour the water into the container first, then add the powder and stir it into a paste. Then use a putty knife or a mud clip to scrape the batch. First, thinly batch (requires exposed bottom) paper stone putty, the dosage is controlled at 0.5 kg/m2 the batch is 1-2.
-It is generally necessary to apply a variety of paints after one week of putty putty finish. If alkali-resistant primer is used, the alkali-reducing time can be shortened.

- Construction performance: batch scratch-free
- Water resistance: no abnormality for 96 hours
- Standard bond strength: ≧ 1.0mpa
- Water resistant bond strength: ≧0.7mpa
-Theoretical dosage: 0.70-l.2Okg/m2 (according to different base layers, the dosage is increased or decreased)
- Dry time: 2 hours (25 ° C)
- Recoating time: 8 hours (25 ° C)
- Dry time: 24 hours (25 ° C)

- The verticality and flatness of the substrate should be determined before construction.
- Do not mix the dried paste with water.
- The stirred putty slurry should be used up within 2 hours.
- Do not apply outside of 5 ° C - 40 ° C or under rain.
- After the putty layer is completed, it should be polished within 1-2 days.